Scenario
The user needs to edit the Quantity in the Work Order that already has an Assembly Build. However, upon doing so, the Quantity field cannot be edited.
Solution
It is by design that Work Orders may no longer be edited once an Assembly Build is made. As a workaround, the users may perform the following:
- If there is a need to decrease the Quantity, Close the Work Order. At this point, the Status is changed from In Process to Closed. Users may then utilize the Assembly Unbuild transaction to remove excess built Assemblies in the system
- If there is a need to increase the Quantity, make a copy from the same transaction with a Memo entry stating that the new Work Order is a continuation of a previously closed one. In the new Work Order, encode the additional quantities to be built